Every off-plan handover should be inspected by someone who isn't on the developer's payroll. Bazar's snagging team walks the unit with a structured 200-point checklist — finishes, MEP, fit-out tolerances, smart-home commissioning — and files a defect schedule the developer is contractually obligated to remediate before you sign off.

آلية العمل

ما الذي يحدث، خطوة بخطوة.

  1. Step 01

    Schedule the inspection

    Book once your developer issues the handover notice. We attend within 5 working days.

  2. Step 02

    Two-hour onsite walk

    Senior inspector + junior, documenting every defect with photos and GPS-stamped notes. You're welcome to attend.

  3. Step 03

    Defect schedule

    Within 24 hours you receive a PDF report with every defect, severity, and the contractual remedy. Filed directly with the developer.

  4. Step 04

    Re-inspection

    We return after remediation to verify each defect is closed before you sign the handover certificate.